Farmhouse barndominium
A white farmhouse-style home with dormers and a wraparound porch, set on open farmland, with a great room under a loft and an open kitchen.
Cordova grew up in the 1800s as a farming community beside a railroad that carried farm products to market, and it is still a rural crossroads at Cordova Road (MD 309) and Kittys Corner Road in Talbot County’s Chapel District, north of Easton. The county’s village master plan counts agriculture and forest as the main land uses, and every August since 1962 the Cordova Volunteer Fireman’s Association has held a three-night country fair behind the firehouse.
We’ve built in Cordova, about 39 miles and 59 minutes from our office in Dover. Because Cordova is unincorporated, every permit comes from Talbot County, and we match each building to the right county application before anything is drawn. From there our designers draw it, we manage the permit through the county’s OpenGov portal, and our crew builds it.
A white farmhouse-style home with dormers and a wraparound porch, set on open farmland, with a great room under a loft and an open kitchen.



Permits for Cordova come from the Talbot County Department of Permits and Inspections, 215 Bay Street, Suite 3, Easton, 410-770-6840, and zoning questions go to the county Department of Planning and Zoning, 410-770-8030. A barn, equipment shed or hay storage that is strictly agricultural uses the Agricultural Structure Permit, a zoning certificate rather than a building permit, issued after a stakeout inspection and closed out with a final inspection. A detached garage or residential pole building goes through Building Permit with Trades, with plans, a site plan and inspections.
Applications go in on the county’s OpenGov portal, and uploaded plans must also be delivered in hard copy. The site plan shows the septic system and sewage disposal area, and Environmental Health signs off. If disturbance reaches 5,000 sq ft or cut and fill exceeds 100 cubic yards, the Talbot Soil Conservation District, 410-822-1577, needs an erosion and sediment control plan. An entrance onto MD 309 or MD 303 goes through the State Highway Administration, and one onto a county road needs a county right-of-way permit.
Who issues the permit
Talbot County Department (Office) of Permits and Inspections
Where this comes from
Permit details checked October 2026. Rules change, so we confirm the current requirements for your parcel before anything is drawn.
The village is zoned Village Mixed, with 25-foot front and rear setbacks, 10-foot side setbacks from neighboring VM lots and 50 feet from MD 309 or MD 303, and buildings plus outdoor use areas may cover 25% of the site. A residential accessory building can reach 25 feet on a lot of 2 acres or less and 30 feet on a larger one, and farm buildings 40 feet. Stables and dairy barns need 100 feet from property lines, and manure or compost structures 200 feet.
Have a question about your property? Call 302-399-4420 and we’ll look it up.
Not a building permit, but it does need a zoning certificate. Talbot County’s Agricultural Structure Permit covers buildings used strictly for agriculture, with a stakeout inspection first and a final inspection when the barn is done. A building that mixes farm use with a home or business takes the regular building permit route.
State maps show no part of the Cordova area inside the Chesapeake Bay Critical Area, so the Critical Area’s 15% lot coverage cap and 100-foot tidal buffer shouldn’t apply, though we confirm your parcel. FEMA maps some Zone A along creeks, and the master plan notes localized flooding along a tributary to Highfield Creek.
Yes. Cordova is about 39 miles from our Dover office, roughly 59 minutes by car. We’ve built in Cordova before, and the farms along MD 309 and MD 303 are well within our reach.
Tell us what you’d like to build and where, and we’ll come back with drawings and a free quote.